The day starts with a grind..... they had to cut over 200 bolts to remove an old metal flange. It held the old coping in place. Next our third design decision. Lights? Yes please! In go 2 LED's. One at each end. Time to put all the dirt back and rough prep the area. The white Styrofoam sitting on the top of the walls is a form designed to cantilever the pool deck over the edge. At the corner you can see the grey coping is placed under it and screwed in place. It will all be covered by the deck. They still have to attach it to the top of the steps. The plan now is to do the forming Monday and deck pour shortly after. Still liking the progress made in 3 days. These guys rock. At this rate we may be swimming again sometime next weekend.