Quote Originally Posted by pinklather View Post
I had a heavy sheffield take me 7 hrs to set a bevel.
Being pedantic or is it semantic , was that 7 hours of bevel setting or does that include all the re-profiling & chip removal ?

Establishing correct geometry on these old beasts is really the challenge. I would think bevel setting time on the 1k was minimal after the heavy lifting on the DMT C.