Results 1 to 10 of 12
Thread: General help with Woodworking
Hybrid View
-
05-14-2014, 09:30 PM #1
-
The Following User Says Thank You to rolodave For This Useful Post:
gkofsky (05-15-2014)
-
05-15-2014, 06:28 AM #2
base material cost divided by final number of items plus processing cost ( say 0.5 hour of your time )
if you cut it into 4 portions at the same time the average cost is less for each piece than cutting each when required
(50÷4)=12.5
+(0.5 x hourly rate say $10/hr)=5 ÷ 4 items = 1.25
total per item is $13.75 Cost
than add your profit margin ??%Saved,
to shave another day.
-
The Following User Says Thank You to Substance For This Useful Post:
gkofsky (05-15-2014)
-
05-17-2014, 11:54 PM #3
Now I have a migraine.
-
05-17-2014, 11:57 PM #4
- Join Date
- Jan 2011
- Location
- Roseville,Kali
- Posts
- 10,432
Thanked: 2027