Results 1 to 10 of 12
Like Tree27Likes

Thread: General help with Woodworking

Hybrid View

  1. #1
    Senior Member blabbermouth Substance's Avatar
    Join Date
    Jun 2013
    Location
    Gladstone QLD AUSTRALIA
    Posts
    3,245
    Thanked: 804

    Default

    base material cost divided by final number of items plus processing cost ( say 0.5 hour of your time )
    if you cut it into 4 portions at the same time the average cost is less for each piece than cutting each when required
    (50÷4)=12.5
    +(0.5 x hourly rate say $10/hr)=5 ÷ 4 items = 1.25
    total per item is $13.75 Cost
    than add your profit margin ??%
    Saved,
    to shave another day.

  2. The Following User Says Thank You to Substance For This Useful Post:

    gkofsky (05-15-2014)

  3. #2
    Senior Member Mastershake's Avatar
    Join Date
    Jun 2011
    Location
    Valdosta, Georgia
    Posts
    454
    Thanked: 92

    Default

    Now I have a migraine.
    Substance likes this.

  4. #3
    Senior Member blabbermouth
    Join Date
    Jan 2011
    Location
    Roseville,Kali
    Posts
    10,432
    Thanked: 2027

    Default

    Quote Originally Posted by Mastershake View Post
    Now I have a migraine.
    So do I(((((((((((((((
    Substance likes this.
    CAUTION
    Dangerous within 1 Mile

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •