Results 1 to 10 of 28
Like Tree11Likes

Thread: A Weekend at Bob Allman's

Threaded View

  1. #3
    AKA "Padlock" LinacMan's Avatar
    Join Date
    Apr 2010
    Location
    Auburn, Alabama
    Posts
    816
    Thanked: 646

    Default 3rd set of images


    Saturday: Here I'm using a checker file to add jimps.


    Saturday: Bob is grinding a gentle "swoops" into the spine of my soon-to-be green-scaled razor (see finished product pics to follow). It was fantastic that Bob let me do almost all of the work on my razors; however, there were a few times such as this step where he said "Here, let me do this part". As Bob said, "It takes about 2 days to make a razor, but it only takes about 5 nanoseconds to f*** one up".


    Saturday: Scoring the razor's edge in preparation for rough grind.


    Saturday evening: Cleaning the razors up a little with a sisal buffing wheel and 220 rouge

  2. The Following 3 Users Say Thank You to LinacMan For This Useful Post:

    boballman (03-11-2011), fonthunter (06-12-2011), Pabster (03-10-2011)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •