Results 1 to 10 of 28
Thread: A Weekend at Bob Allman's
Threaded View
-
03-10-2011, 05:02 PM #3
3rd set of images
Saturday: Here I'm using a checker file to add jimps.
Saturday: Bob is grinding a gentle "swoops" into the spine of my soon-to-be green-scaled razor (see finished product pics to follow). It was fantastic that Bob let me do almost all of the work on my razors; however, there were a few times such as this step where he said "Here, let me do this part". As Bob said, "It takes about 2 days to make a razor, but it only takes about 5 nanoseconds to f*** one up".
Saturday: Scoring the razor's edge in preparation for rough grind.
Saturday evening: Cleaning the razors up a little with a sisal buffing wheel and 220 rouge
-
The Following 3 Users Say Thank You to LinacMan For This Useful Post:
boballman (03-11-2011), fonthunter (06-12-2011), Pabster (03-10-2011)